• Home
  • 1-a’bangsa
  • Classics
  • LOL
  • My CSI
  • PIBG
  • TBU Hillside
  • UK Bistari

rights2write

"Believe nothing, no matter where you read it or who has said it, not even if I have said it, unless it agrees with your own reason and your own common sense."

Feeds:
Posts
Comments

TBU Hillside

This page is created on request by several residents in TBU who reads my blog. They wanted a dedicated page that focus its content on the safety issue that affects Taman Bukit Utama. Following a series of repeated request over 4 months period to MPAJ to maintain the drains at the hillside of TBU, they finally took action after the intervention by the State Government.

The article can be read clicking “Open letter to Tan Sri Khalid and Friends.. Please wake up !“


Progress of cleaning works of the Hillside Drains at TBU.

Job scope
1. Clearing all horizontal and vertical drains on the terrace. Total of 5 horizontal terraces
2. Clearing of all small vegetation on the terraces
3. Repairs of all damaged drains
4. Landscaping of terraces with proper root binding trees
…………………………
21/3 – Article published

22/3- sms exchange with Izzudin, BA local councillor

22/3 – sent email of the article to YDP, MB, and Zahir (MB special assistant)

23/3 – was informed by MPAJ inside contact that MPAJ was shaken by the article and was followup by zahir

23/3 – MPAJ officers and contractors visit site.

24/3 – MPAJ contractors started work. At 500 pm, I had inspected the work done. About 5 percent work done.Drains found and interconnected with the drains at Puncak Athenium and run down to Hillview. Drains linking Athenium and those going to Taman hillview are totally buried.Soil soggy.Trees growing in the drain.

25/3 – Another row of drains cleared. Estimate total clearance at about 8% to date. The drains at least can be seen now. Sump broken in one place. Need engineering intervention once cleaning completed.

26/3 – No work done

27/3 – No work done

1/4/ – Spoke to Siti Mariam on the needs to get terrace and drain cleaned. PPTBU is required to sent a letter to officialize request. Shahrul informed

2/4 – Letter from Shahrul Teh fax to MPAJ

3/4 – Sorry for not updating for a long time. I was away. Inspected the site. Level 1 drain near gazebo almost cleared. There is a fountain at the base of the first terrace. This water is oozing freely (mineral water?) and if drainage not manage, it can be a problem. The oozing water actually indicates the water table and the fact that there is a sub- soil stream in the ground of our Taman.

4/4 – Level 1 terrace 80% cleaned along the Gazebo area. The drains at the base of Athenium has not been touched. Two vertical drains has been cleared.

11/4 – Another level of buried drain was unearth. It is like discovering treasures everyday. The new drain is buried partly up to 4 feet of earth.

12/4 – Inspected the drain. Rain water flowing smoothly in most areas. Some areas are still clogged. Broken sump need to be repaired. Got in touch with FRIM. They will provide list of suitable tree to plant on the terraces.

25/5 – A geotechnical engineer from Dept of Geo Science Selangor visited the site this morning with Dato Shawal. He took water samples for analysis



Related Links
1- Antarabangsa

2 Comments »

2 Responses

  1. on 14/05/2009 at 11:33 PM Pictures says a thousand words…. « rights2write

    [...] TBU Hillside [...]


  2. on 06/04/2009 at 9:18 PM A resident

    Dr Raffick
    Thank you very much for all the effort in making sure MPAJ do their work to clear the slopes and the daily reports. May GOD bless you and your family.



Comments are closed.

  • Expectations

    • 947,348 readers
  • Up periscope

  • Voulez vous

    • Bukit Antarabangsa: Did Shaziman lie in parliament?
    • Bukit Antarabangsa – U turn in public disclosure.
    • Matrade Expo center: Direct negotiation must stop!
    • TALAM & Selangor Government – Cleaning up previous government mess
    • Bukit Antarabangsa landslide: Did the government know that it will happen?
    • Terimakasih, MB dan Kerajaan Negeri Selangor
    • Bukit Antarabangsa, Official secret Act and our Maharajah
    • Sudah potong?
    • PI Bala- The last thorn in the flesh? (BALA membawa bala..)
    • Hello Najib… some ideas for you to think about
    • Perak: The Final curtain for Nizar?
    • Wang ehsan.. My foot!
    • 1-School system and 1-Malaysia
    • “Muslims in Perlis not the same as Muslims in Selangor”.
    • PAS EGM: What is in Nik Aziz mind?
  • Most laku

    • Bukit Antarabangsa: Did Shaziman lie in parliament?
    • Bukit Antarabangsa – U turn in public disclosure.
    • TALAM & Selangor Government – Cleaning up previous government mess
    • Matrade Expo center: Direct negotiation must stop!
    • Bukit Antarabangsa landslide: Did the government know that it will happen?
    • Bukit Antarabangsa, Official secret Act and our Maharajah
    • Death at MACC: My CSI XVI – Making sense of the 80% probability
    • PI Bala- The last thorn in the flesh? (BALA membawa bala..)
    • PUSRAWI Medical Report.. did RPK erred?
    • Terimakasih, MB dan Kerajaan Negeri Selangor
    • My CSI
    • Sudah potong?
  • historical stuff

  • Market place

    CSI on Bukit Antarabangsa: Did Shazim…
    balasi on Bukit Antarabangsa: Did Shazim…
    balasi on Bukit Antarabangsa: Did Shazim…
    balasi on Bukit Antarabangsa: Did Shazim…
    balasi on Bukit Antarabangsa: Did Shazim…
    balasi on Bukit Antarabangsa: Did Shazim…
    balasi on Bukit Antarabangsa: Did Shazim…
    balasi on Bukit Antarabangsa: Did Shazim…
    ylchong on Bukit Antarabangsa: Did Shazim…
    balasi on Bukit Antarabangsa: Did Shazim…
    balasi on Bukit Antarabangsa: Did Shazim…
    balasi on Bukit Antarabangsa: Did Shazim…
    balasi on Bukit Antarabangsa: Did Shazim…
    balasi on Bukit Antarabangsa: Did Shazim…
    balasi on Bukit Antarabangsa: Did Shazim…

Blog at WordPress.com.

Theme: Mistylook by Sadish.